Year Customer Name of analysis
2006 AVS design, Ostrava Static analysis of Pipeline of primary air. Project TEMBEC.
2007 AVS design, Ostrava Static analysis of Pipeline of flue gas cleaning. Envirgy, Project Dürnrohr.
2007 AVS design, Ostrava Static analysis of Pipeline of primary air. Project UMEA.
2008 AVS design, Ostrava Static analysis of Pipeline of large diameter. Project MAXAU.
2011 AVS design, Ostrava Strength analysis of Pipeline reconstruction. Strabag, Project Laziska.
2013 AVS design, Ostrava Strength analysis of Combustion Chamber. Project Swedspan Malacky.
2014 AVS design, Ostrava Strength analysis of Flue Gas Systém. Project MJÖLBY.
2014 AVS design, Ostrava Roof of new screen. Check of bearing capacity. EME 1.
2016 AVS design, Ostrava Strength assessment of Feedwater tank, Deaeration vessel and
Condensate tank.
2017 AVS design, Ostrava Strength assessment of Fecal container brackets to Regiojet wagon.
2019 AVS design, Ostrava Circular lid of cyclone strength assessment.
2006 NOEN, Uničov Static analysis of Slew deck & Discharge boom of VASP spreader,
Project Sishen.
2006 Timken ČR, Brno Calculation of freewheel clutch.
2008 Timken ČR, Brno Calculation of thermal deformations of engine block.
2007 ARAKO, Opava Stress analysis of shut-off valves for nuclear industry.
2008 Mostro, Praha Strength assessment of back valves.
2006 SIGMA Energo, Třebíč Increasing of seismic resistance of pump.
2008 SIGMA Energo, Třebíč Assessment of seismic resistance of high pressure pump 1TK.
2006 DT výhybkárna a strojírna, Prostějov Analysis of machine for straightening of crossings.
2006 DT výhybkárna a strojírna, Prostějov Analysis of portal crane.
2009 DT výhybkárna a strojírna, Prostějov Analysis of railways sliding chairs.
2009 DT výhybkárna a strojírna, Prostějov Optimalization of railways dilatation equipment.
2009 DT výhybkárna a strojírna, Prostějov Stress-strain analysis of railway castings.
2013 DT výhybkárna a strojírna, Prostějov Assessment of safety cover of spring testing stand.
2007 SIGMA, Lutín Optimization of service inspection interval of main coolant pump, NPP Bohunice.
2007 SIGMA, Lutín Optimization of service inspection interval of main coolant pump, NPP Mochovce.
2011 SIGMA, Lutín Strength assessment of volute casing of pump A-600-HVBW.
2013 SIGMA, Lutín Static analysis of  plate of feed pump stand. 660 MWe Ledvice.
2013 SIGMA, Lutín Assessment of fatigue strength of collectors of descaler for DUO stand.
2013 SIGMA, Lutín Assessment of fatigue strength of quick acting stop valve Tiefenbach.
2013 SIGMA, Lutín Dynamic assessment of pump system and static analysis of steel structure. Treboradice.
2018 SIGMA, Lutín Strength assemssment of high pressure pipeline of descaler system. Magnitogorsk.
2009-12 SIGMA Lutín (ŠKODA JS) NPP Mochovce, Units 3, 4, proving documentation of primary loop equipment.
2018 SIGMA Lutín (ŠKODA JS) NPP Mochovce, Units 1, 2, Improvement of seismic resistance of support of GCN-317.
2016 ŠKODA JS Check calculation of main flange connection GCN-195M with T-5824 seal. Zaporozhye NPP.
2019 SIGMA Slovakia Dynamic assessment of vertical pumping unit 600-CVFV. Slovnaft.
2011 ISH&MSA, Olomouc Analysis of pump BETA-37.
2006 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Modern Enerji.
2007 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Ambatovy.
2008 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Bagfas.
2008 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project BOLEO ACID.
2009 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project YFY CHIU TANG.
2009 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project LULEBURGAZ.
2011 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project GUNUNG MEGANG.
2012 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Dedeli Bilecik.
2012 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Cengiz II.
2013 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Eagle Valley.
2013 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Stavrolen.
2013 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Tupras.
2013 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Gunjang Energy 3.
2013 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Canfor.
2014 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Fort St. James.
2014 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Delek Sorek.
2014 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Merritt.
2015 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project CHILCA.
2016 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Siam Kraft.
2016 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project E TEC.
2016 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Sonora.
2016 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Quincy.
2016 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Rock Salt.
2017 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project MCLBA.
2017 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Northwood.
2017 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Sugat.
2018 Siemens Turbomachinery, Brno Anchorage of Turboset into Concrete Foundation. Project Gulf Chana Green.
2008 HYDROSYSTEM project, Olomouc Optimization and assessment of high-pressure descaler pipes.
2011 HYDROSYSTEM project, Olomouc Strength calculation of homogenizer screen.
2012 HYDROSYSTEM project, Olomouc Strength calculation of separator chamber.
2013 HYDROSYSTEM project, Olomouc Strength calculation of resonator body.
2014 HYDROSYSTEM project, Olomouc Strength and fatigue assessment of NGP-500 homogenizer.
2014 HYDROSYSTEM project, Olomouc Strength calculation of compression chamber lid using split flanges.
2014 HYDROSYSTEM project, Olomouc Strength assessment, determination of dynamic properties of DN300 PN350 resonator.
2015 HYDROSYSTEM project, Olomouc Strength assessment of bolts and inlet valve seat of WOMA 550ARP P70 pump.
2016 HYDROSYSTEM project, Olomouc Assessment of static strength of settling tank with 2800 mm diameter.
2017 HYDROSYSTEM project, Olomouc Vibration measurement and assessment of high-pressure accumulator system.
Constellium Děčín.
2017 HYDROSYSTEM project, Olomouc Assessment of static and cyclic strength of resonator DN300, PN350.
2018 HYDROSYSTEM project, Olomouc Strength calculation of PN350 resonator body.
2018 HYDROSYSTEM project, Olomouc Strength calculation of horizontal dispenser chamber PN350.
2012 S-ARMAT, Dolní Benešov Torsion analysis of feed pump set Flowserve. Planta Centro Cadafe.
2012 Renetra Drahotuše Assessment of dynamic properties of pump CSI 500-40V.
2012 Renetra Drahotuše Assessment of base frame anchorage of pumps CSI 300-500D, CSA 400-720.
2013 Renetra Drahotuše Assessment of anchoring of vertical pumps 51MX.
2014 Renetra Drahotuše Assessment of anchoring of vertical pump CSI 600-3V.
2015 Renetra Drahotuše Assessment of anchoring, frame strength and dynamic of pumping unit CSI-500-1050 D.
2015 Renetra Drahotuše Dynamic analysis of CDSV 600-700 pump set.
2016 Renetra Drahotuše Assessment of anchoring, frame strength, dynamic properties of pumping unit CSI 700-600.
2016 Renetra Drahotuše Calculation of strength, durability and seismic resistance. CSA 80-250 pump.
2017 Renetra Drahotuše Anchorage of pumps CSA 050-200, 300-400, 301-400, CSI 032-160, 150-400.
2017 Renetra Drahotuše Anchorage of pumps CSIV 500-500, CSIV 700-700.
2018 Renetra Drahotuše Anchorage of pumps  CSE 40-160, CSE 40-200, CSE 32-250.
2018 Renetra Drahotuše Strength assessment of frames of pumps CRA 150-150EM, CRA 250-250L, CRA 150-100G.
2006 JE Temelín Calculation of tightness of main circulation pump GCN-195M.
2011 JE Temelín Evaluation of diagnostic data of main circulation pump GCN-195M.
2011 JE Temelín Recalculation of screw connection of main circulation pump GCN-195M.
2012 JE Temelín Solution of vibrations of main condensate pumps.
2013 JE Temelín Solution of increased vibrations of TQ pump motor.
2013 JE Temelín Solution of increased vibrations of SD pumps.
2015 JE Temelín Assessment of relative shaft vibration in axial direction of booster pump 1TBN2.
2015 JE Temelín Analysis of increased vibrations and anchoring of electric motor.
2018 JE Temelín Analysis of impact of vibrations of EPK piping.
2018 JE Temelín Solution of increased vibrations of air ejectors of turbine feed pumps TBN.
2018 JE Temelín Calculation of tightness of HDR GCN-195M with Grewis disc springs.
2017 JE Dukovany Assessment of static strength of 250-KHX pump housing after repair.
2019 JE Dukovany Completion of proving documentation of main pump GCN-317.
2019 JE Dukovany Completion of proving documentation of equipment of auxiliary systems of GCN-317.
2019 JE Dukovany Completion of proving documentation of emergency feeding pump.
2017 Elektrárna Chvaletice Dynamic analysis of vertical raw water pumps 400-CVFV.
2013 RegioJet Praha Strength assessment of static power conventer SSVC 43 fastening to wagon AB.
2013 RegioJet Praha Strength assessment of connection of feacal container ASTRA to wagon chassis.
2014 LASKI Smržice Assessment of static and cyclic strength of chassis of chipper.
2015 LASKI Smržice Assessment of static and cyclic strength of trailer frame for leaf vacuum cleaner.
2017 LASKI Smržice Assessment of strength of chipper rotor.
2014 VST Engineering Pardubice Calculation of explosion resistance of malt silo.
2016 VST Engineering Pardubice Calculation of explosion resistance of vertical grinder.
2016 VST Engineering Pardubice Calculation of explosion resistance of grain tank.
2017 VST Engineering Pardubice Calculation of explosion resistance of cyclone.
2017 VST Engineering Pardubice Calculation of explosion resistance of filter.
2018 VST Engineering Pardubice Calculation of explosion resistance of vertical storage tank.
2016 ÚJV Řež Calculation of seismic resistance of main circulation pump GCN-317, Rovenská NPP,
Units 1 and 2.
2016 ÚJV Řež Calculation of static and cyclic strength of main circulation pump GCN-317, Rovenská NPP, Units 1 and 2.
2016 VYNCKE, Frýdek Místek Strength assessment of support footers welded on membrane wall of boiler.
2017 VYNCKE, Frýdek Místek Strength analysis and optimization of boiler double wall with reinforcing staybars.
2018 VYNCKE, Frýdek Místek Strength assessment of hoisting equipment of DWS casing.
2017 FLUID Engineering Olomouc Assessment of static and cyclic strength of shock damper DN300 PN250.
2017 DC Pumps Dolní Benešov Dynamic analysis of Flowserve pump.
2017 DC Pumps Dolní Benešov Dynamic analysis of 150-MVH vertical pump.
2016 SIGMA PUMPY Hranice Assessment of screw connection of hydraulic part to crankcase of pump PCX-3.
2017 SIGMA PUMPY Hranice Assessment of bolt strength of hydraulic part of pump PAX-3-160-63.
2014 PME Přerov Dynamic analysis of separator rotor.
2015 PME Přerov Strength assessment of supporting frame of container cooler.
2015 PME Přerov Strength assessment of gripper manipulator of grinding balls.
2016 PME Přerov Assessment of static load-bearing capacity of 15 ton bar for sheet metal handling.
2018 PME Přerov Strength assessment of container cooler strength.
2018 PME Přerov Strength assessment of container strength for PTR cell storage.
2019 PME Přerov Strength assessment of outer casing of separator.